Monday, March 30, 2009
Monday, March 23, 2009
we have some visual progress
Friday was a BUSY day at 2204 Hampton Court.....the electricians were there, the plumber was there, the guys digging to hook us up to water were there, roofers and BRICKLAYERS!! Yes, the outside stuff has begun! As of this evening, the roof is 80% finished!! As soon as that is finished, the insulation will begin as long as the electrician is finished. They had to lay the brick around all the porches so they could "pour" the porches. They now will start on the south end of the house. As of today the plumber was installing the shower fixtures in the showers that are going to be tiled. They had installed the fiberglass shower in the bathroom above the garage along with 3....yes 3 water heaters (the bathroom above the garage is on a separate one). The heating/cooling crew was hooking the finishing things up on the furnaces and were disabling the temporary furnace. Supposedly they will start digging the "wells" for the geothermal next week....all 8 of them. We aren't, however, hooked up to water yet. Not sure what that hold up is. They are digging in the yard......Funny thing, they are using the water out of the sump pump hose and collecting it in a barrel for the bricklayers to make the mortar. Sometime this week Sean's new favorite person...the audio guy....is coming to check for the layout of the house (speakers, stereo, tv, security, etc). I met with one Landscaping company (yes, a little early) today and we will meet with another in a few weeks....Doug (builder) made up a sample of the beams that are going up in the great room......they look great!!
SOOOOOO that is the progress in a nutshell.
roof
roof....the un-roofed portion is actually roofed now
SOOOOOO that is the progress in a nutshell.
roof
roof....the un-roofed portion is actually roofed now
You can see the beams that will be the roof of the porch. That is the Autobaum crew...it was FREEZING friday morning....bless their hearts. I could watch them all day, it is a facinating skill. I dont, however, think they would appreciate me there with my zillion questions.....
Tuesday, March 17, 2009
Weasel or Weasle
Finley has learned a new song.....you know how you have favorite words you kids say....
For instance Braden says "cheesburger"..."cheesbeeger" and "triangle"..."trirangle".
Finley ALWAYS makes us laugh when we say grace "God is great, God is good, let us thank him for our pood." For some reason, I just smile when she sings this because of how she says "weasel"
Saturday, March 14, 2009
spooky weekend
I got a call from a fellow blogger and friend a few weeks back with a request. They live in S.C. and were travelling here this weekend to celebrate their daughters birthday. She was going to be at a conference all day today and knew she wouldn't have time to make them herself. So she called me to be the "baker". Alaina, the birthday girl, had requested a Halloween themed birthday party, so here is my intrepretation.....the party is tomorrow....maybe in a few days Nicole will update her blog with photos from the big event!!
moving right along
For the future washer/dryer. I had to decide in a day what w/d we were going to have. So i picked one....hopefully it is the one we end up buying (hahaha)
The soffit around where Sean's bar is. There will be some small can lights in it as well as the cabinets against the wall will be lit and a "parlor" type light back there too...
Electrical wires have been run....yellow wire, everywhere
The soffit around where Sean's bar is. There will be some small can lights in it as well as the cabinets against the wall will be lit and a "parlor" type light back there too...
Electrical wires have been run....yellow wire, everywhere
Apparently, the brick is in and the bricklayers are ready to go. The house, however is not. 2 things....one, there is no water to the house yet. The plumber HAS to do that, otherwise there is no water to make the mortar....second, the porch has to be "tied" into the house so the bricklayer can lay bricks around it. It doesn't have to be finished completely....just "tied" in. Because of this, the guys moved outdoors in the nicer weather to get that finished. This picture is early Friday and by the end of the day they had posts up past the door.
Side view...and Doug, who hates pictures...calls me the paparrazi
Side view...and Doug, who hates pictures...calls me the paparrazi
Wednesday, March 4, 2009
Its the little things
So I am hosting a ladies luncheon in 3 weeks. Normally I wouldnt freak out. But for some reason, I am. So tonight since Sean was going to be exceptionally late (its 735 p.m. and he still has a hernia case to go) I decided to clean the little things. The things that get totally over looked. In the dining room...where they will spend some time....I have washed the drapes, dusted the crown moulding, base boards and ceiling for cobwebs. Washed the 3 windows, wiped down the sills and the french doors into the room. I even tackled the chandelier...it had dead bugs in it people...have you ever investigated your light fixtures....ick. So I took apart the light and washed all the crystal pieces. All the while drinking some wine...why not??
House Progress
So the weather has been great....here is the progress
1. ALL the soffit work is finished (which I didnt get a picture of). This is HUGE because that means the house is basically enclosed. It was a lot of work and the guys did a great job. Because we are bricking the ENTIRE joint, they had to add this additional structure where the brick would meet the soffit...so they touched every spot twice, plus had to install vents for the attic. Doug has assured me the house will be bat proof....wink, wink.
2. All the heating and cooling duct work is in place. Both furnaces are installed and the venting to the "chimney" is finished. The geo-thermal (hello tax credit) units are in place, however they are waiting for more stable weather to dig the geo-thermal "wells".
3. The gas lines are ran to the fireplace/dryers and stove.
4. 85% of the can lights and plates for light fixtures are installed.
5. Most of the outlet boxes and lightswitch boxes are installed. NO WIRING yet.
6. The bar, fireplace, my craft room (totally cool), sean's office and the kitchen cabinetry floor plan has been "drawn" on the floor to check placement.
7. The Bricklayer is READY!!! However, we aren't. Doug needs to get our front and back porch columns put in before they can start. He thinks that will take a couple weeks....Jake is doing a National Guard committment and Matt is in Hawaii (lame excuse....ha ha). So they are down to 2 guys.
8. The roofer will start in 2 weeks...whooo hooo....pray for no (or little) rain.
9. We have to pick out appliances....so they know where lines need to be ran for installation....YIKES!!
We are using PEX (i think that is how you spell it). It is flexible tubing for the water lines...here they are delivered (obviously uninstalled)
This is where the future TV will go...between our pair of french doors....
1. ALL the soffit work is finished (which I didnt get a picture of). This is HUGE because that means the house is basically enclosed. It was a lot of work and the guys did a great job. Because we are bricking the ENTIRE joint, they had to add this additional structure where the brick would meet the soffit...so they touched every spot twice, plus had to install vents for the attic. Doug has assured me the house will be bat proof....wink, wink.
2. All the heating and cooling duct work is in place. Both furnaces are installed and the venting to the "chimney" is finished. The geo-thermal (hello tax credit) units are in place, however they are waiting for more stable weather to dig the geo-thermal "wells".
3. The gas lines are ran to the fireplace/dryers and stove.
4. 85% of the can lights and plates for light fixtures are installed.
5. Most of the outlet boxes and lightswitch boxes are installed. NO WIRING yet.
6. The bar, fireplace, my craft room (totally cool), sean's office and the kitchen cabinetry floor plan has been "drawn" on the floor to check placement.
7. The Bricklayer is READY!!! However, we aren't. Doug needs to get our front and back porch columns put in before they can start. He thinks that will take a couple weeks....Jake is doing a National Guard committment and Matt is in Hawaii (lame excuse....ha ha). So they are down to 2 guys.
8. The roofer will start in 2 weeks...whooo hooo....pray for no (or little) rain.
9. We have to pick out appliances....so they know where lines need to be ran for installation....YIKES!!
We are using PEX (i think that is how you spell it). It is flexible tubing for the water lines...here they are delivered (obviously uninstalled)
This is where the future TV will go...between our pair of french doors....